Modular building specialist Reds10 has started construction on new army accommodation blocks in Upavon, Wiltshire.

Four new single living accommodation (SLA) blocks are being delivered by Reds10 for the Defence Infrastructure Organisation (DIO), providing 200 bed spaces at Trenchard Lines in Upavon.

It is part of the Army’s SLA programme, which is investing £1.4bn over 10 years to support the modernisation of the Army estate and provide 8,500 new bedspaces.

In the first phase of the Upavon project, five old accommodation blocks will be demolished and replaced by 200 en-suite bedsits in four separate buildings. The new SLA blocks include kitchens and communal space.

Concurrently an older building onsite will be refurbished to provide 21 ensuite bedrooms, improving on the previous interior layout of 19 bedrooms with shared wash facilities.

A minimum of 85% of the new accommodation will be manufactured in Reds10’s factory in Driffield, east Yorkshire, before being transported to Upavon for assembly on site.

The SLA blocks will have solar panels, individual thermostats and a building energy management system to support efficiencies in running and maintenance. An all-electric design comprising air source heat pumps, heat recovery ventilation and infra-red panels will also contribute to low energy consumption.

In addition to the SLA blocks, construction on a new Officers’ Mess at Upavon will begin in 2025 to provide a further 69 bedspaces. All the buildings will be handed over in phases, with the entire project due to complete in autumn 2026.

Reds10 chief executive Matt Bennion said: “Building on our other successful projects at Imjin Barracks and RMA Sandhurst, these state-of-the-art buildings will deliver sustainable, high-quality and cost-effective new accommodation for our armed forces personnel, demonstrating the benefits of MMC for both occupants and the defence estate.”

Warren Webster, the Defence Infrastructure Organisation’s major programmes and projects (Army) director, added: “A momentous occasion for Trenchard Lines. Major infrastructure upgrade is overdue on this historically important site, so we are delighted to have reached this point.

“The Army’s programme of single living accommodation upgrade was initiated in 2021 and Trenchard is the ninth project to start construction. A fantastic collaboration with our Army colleagues to achieve real progress for the benefit of our service personnel.”

Source: The Construction Index

Twenty traditional construction firms have signed up to an £800m modern methods of construction (MMC) framework aimed at delivering social housing.

The Integrated Traditional Build and MMC Framework was set up in response to feedback from social housing providers that wanted “trusted local building firms to lead MMC projects and deliver traditional construction elements”.

The framework was launched by Building Better and Procurement for Housing (PfH); it aims to boost the use of MMC in social housing across England and Wales.

Building Better is a National Housing Federation-backed alliance of housing associations and councils.

Along with the 20 traditional house builders, two MMC firms have signed up to the four-year framework.

It will help social housing providers to “procure principal contractor services for a range of MMC projects, including low and medium-rise housing, apartments and extra-care homes”, Building Better and PfH said.

Tony Woods, technical manager – construction and sustainability at PfH, said: “Over recent years, we’ve seen MMC companies focusing more on manufacturing their systems rather than providing a turnkey service.

“It makes sense to bring in traditional builders with a strong reputation in a local area to manage these MMC projects and deliver any traditional build elements, too.”

Among the traditional builders are CG Fry & Son, Feltham Construction and Wates Residential.

The two MMC firms are Agile Property and Homes, and Enevate Homes.

“This framework provides councils and housing associations with a compliant route to procuring principal contractor services for MMC sites,” Mr Woods added.

Jamie Watkins, operations manager at Elkins Construction, said: “Over the last few years, we have seen increased requirements from our clients for net-zero homes and this has meant the need to use more innovation in our construction practices.”

Mr Watkins added that MMC or hybrid construction could help reduce time spent on site, as well as improve quality and reduce the company’s carbon footprint.

Lewis Tolputt, business development manager at Classic Builders, said: “As a traditional contractor founded over 20 years ago, we are continually looking at ways we can innovate and offer our customers increased choice. The use of MMC products is just one of the ways we’re able to stay ahead of our competition.”

The use of MMC has seen mixed progress so far. Panellised systems, known as Category 2 MMC, are seeing some take-up, but fully modular houses built in a factory – Category 1 MMC – have struggled to take hold in the UK, despite being used successfully in other countries.

In January, a House of Lords inquiry concluded that the government’s approach to MMC was in “disarray”.

Modular house builder TopHat faced a winding-up petition. It announced earlier this year it was planning to make around 70 staff redundant and was pausing opening its 650,000 sqft new factory in Northamptonshire.

Yet this week, an initiative aimed at delivering MMC homes with zero energy bills was launched by Liverpool City Region mayor Steve Rotheram.

Source: Inside Housing